SMA Estimating

Florida Construction Estimating Services

If you are struggling with cost estimates then our Florida Construction Estimating services are here to lighten up your heavy load and guarantee you precise estimates!

Florida is the one state where a national cost database will put you on the wrong side of a bid. A 175 mph design wind speed in Miami-Dade, a Notice of Acceptance on every envelope product, no state prevailing wage, and a code edition changing on 31 December 2026 all move the number, and none of them appear in national averages.

SMA Estimating takes off and prices Florida work against the code edition, wind zone, and county that will actually govern the permit. Send the plan set and the project address. We confirm the governing wind zone and code edition first, then return an itemised takeoff and estimate in 24 to 48 hours.

The FBC 9th Edition Takes Effect 31 December 2026, and It Changes Your Number

The 8th Edition (2023) is Florida’s operative statewide code through almost all of 2026. The 9th Edition is scheduled to take effect on 31 December 2026. Which one governs is decided by your permit date, not your bid date.

Permits filed before 31 December 2026

The project is generally processed under the 8th Edition for the life of that permit. If you are bidding autumn work with a realistic permit date in November or December, we price to the 8th Edition and state that assumption on the estimate cover sheet. This keeps the number consistent through revisions, resubmittals, and any permit delays that push the actual filing date closer to year end.

Permits filed on or after 31 December 2026

The 9th Edition is the rule that applies now. It uses ASCE 7-22 wind load numbers. Shifts energy rules closer to the 2024 IECC and updates Florida Product Approvals. Plus, it requires more new buildings near tidal water to have impact-resistant walls and windows. On a coastal shell, that is a glazing and opening-protection cost swing, not a rounding error.

What that means for a bid you are writing now

Anything with a permit date near the turn of the year is a two-number problem. On projects that straddle the transition, we price both edition assumptions separately, so you are not carrying an unquantified code risk into a GMP. We confirm the governing edition against the Florida Building Commission and the local building department before the estimate is finalised. We do not assume it.

HVHZ or Wind-Borne Debris Region: Your Florida County Decides the Envelope Cost

This is the most common reason a Florida estimate comes back wrong. The two zones are not interchangeable, and the product approval paths are different.

High-Velocity Hurricane Zone Wind-Borne Debris Region Inland
Where Miami-Dade and Broward only 140 mph and above, plus 130 mph and above within one mile of the coastal mean high-water line Below 130 mph
Design wind speed, Risk Category II Around 175 mph Miami-Dade, 170 mph Broward Typically 130 to 160 mph Around 130 mph and below
Product approval Miami-Dade NOA, tested to TAS 201, 202 and 203 Florida Statewide Product Approval, impact rated Standard FBC
Openings Impact-rated or permanently attached approved shutters on every glazed opening Same requirement, lower design pressure Not required by code
Effect on the estimate Highest. HVHZ rated fenestration carries a real premium over standard impact product Moderate Baseline

Two traps we check on every Florida takeoff.

A Miami-Dade NOA on its own is a local approval. It is valid in Miami-Dade and accepted in Broward, but a product installed anywhere else in Florida needs a Florida Statewide Product Approval. Specifying an NOA for a Tampa job is a change order waiting to happen. For projects inside Miami-Dade itself, our construction estimating services in Miami price every envelope line against current NOA requirements.

Approvals expire. NOAs are product-specific and time-limited. A DP rating that was compliant when the spec was written may not be current at install. We flag approval numbers that need re-verification rather than pricing them silently.

Monroe County and the Keys sit outside the HVHZ by definition but apply equivalent wind-zone product rules. We price that area as HVHZ.

Florida Wage Rules That Change Your Labour Line

Florida is not a prevailing wage state. Estimators working from Northeast or California assumptions routinely over-price labour here as a result.

No state prevailing wage. Florida’s Little Davis-Bacon Act was repealed in 1979, and nothing replaced it. On state- or locally funded public work with no federal money, there is no wage floor beyond the state minimum wage.

Davis-Bacon still applies to federally funded work. Federal or federally assisted construction contracts over $2,000 carry Department of Labor wage determinations, certified payroll, and weekly pay. Given the volume of federal hurricane recovery, military, and transportation money moving through Florida, this catches more projects than contractors expect.

Local wage ordinances are being preempted. HB 705 (2024) changed the definition of “public works” to limit local prevailing wage rules. HB 433 fully blocks local governments from setting their own wage rules for contractors, starting September 30, 2026.​​​​​​​​​​​​​​​​ If you are carrying a Miami-Dade Responsible Wages or City of Orlando line in a forward-priced bid, that assumption needs rechecking.

We price Florida labour off current market rates by trade and metro, and apply a Davis-Bacon determination only where the federal nexus is real. Tell us at handover if your project has federal funding, because it changes the labour build-up and not only the paperwork.

Market What moves the estimate
Miami-Dade and Broward HVHZ throughout. NOA product control, third-party envelope inspections, highest fenestration and roofing cost in the state.
Palm Beach to Martin Wind-borne debris region, not HVHZ. Same opening protection obligation, lower design pressure, statewide approval path.
Tampa Bay and Pinellas 140 to 150 mph design speeds, heavy coastal flood and freeboard exposure, active local amendment lists.
Orlando and Central Florida Largely inland wind zones, tightest labour market in the state on MEP trades.
Southwest Florida, Lee and Collier Post-Ian rebuild volume, substantial improvement triggers on existing structures, 160 to 170 mph coastal speeds.
Jacksonville and the Northeast Lower wind loads, higher wood-frame share than South Florida, different subcontractor pricing base.
Panhandle Post-Michael code enforcement, longer material haul distances, thinner subcontractor bench on specialty trades.
Monroe and the Keys HVHZ-equivalent product rules plus barge and logistics cost that South Florida pricing does not carry.

How Florida Code Splits Residential, Commercial and Industrial Estimates

The same square footage prices differently in Florida depending on which code volume and Risk Category governs it. We scope each of the three separately.

Residential Estimating Under the Florida Residential Code

Single-family, townhome, and low-rise multifamily work is priced against FBC-R. The lines that move a Florida residential number are opening protection on every glazed opening inside the wind-borne debris region, roof deck attachment with a secondary water barrier, and the continuous strap and tie-down schedule from roof to foundation. In flood zones, finished floor elevation and local freeboard requirements change foundation quantities before a single wall is framed.

On remodels and re-roofs, the trigger rules matter more than the scope. Replacing above the threshold percentage of a roof or of the openings can pull the whole assembly up to current code, which turns a repair budget into a replacement budget. We identify that trigger in the takeoff rather than leaving it for the inspector to find.

Get a Residential Estimate

Commercial Estimating Under the Florida Building Code

Retail, office, hospitality, medical, education, and mixed-use priced against FBC-B. Risk Category is the first thing we establish, because an essential facility carries a materially higher design wind speed than a standard Risk Category II building on the same street, and that flows straight into structure, envelope, and glazing cost.

Florida commercial work also carries requirements that do not exist in most states. Threshold buildings under Florida Statute 553.79, generally those over three storeys or fifty feet, require a structural inspection plan and a special inspector. Inside the HVHZ, envelope installation carries third-party inspection on top of that. Both are real line items, and both get priced, not assumed.

Get a Commercial Estimate

Industrial Estimating in Florida's Coastal Wind and Flood Zones

Warehouse, distribution, manufacturing, cold storage, and utility work. Large span metal building systems and tilt-up panels behave very differently under Florida wind loads than under national averages, and open industrial sites frequently sit in a higher exposure category than a comparable urban parcel, which raises design pressure across the whole envelope.

Critical and essential industrial facilities move up the Risk Category scale and take the highest design wind speeds in the code. Add equipment elevation in flood zones, standby power provisions, and stormwater requirements on large impervious sites, and the delta against a national industrial benchmark is significant.

Get an Industrial Estimate

Trade Scopes Where Florida Code Changes the Takeoff

  • Roofing: Secondary water barrier, enhanced deck attachment, HVHZ six-nail patterns, and the existing building code rules governing recover versus full tear-off. The 9th Edition is expected to permit partial roof recovery in defined cases, which is a direct quantity change on re-roof work.
  • Glazing and openings: Impact units versus permanent shutters, DP rating matched to the calculated pressure per opening, buck depth, and anchor spacing per the approval listing.
  • Structural: Continuous engineered load path from roof to foundation, gable-end bracing, roof-to-wall connectors. Florida’s tie-down schedule is a real steel and hardware quantity, not a note on a drawing.
  • Concrete and masonry: CMU shell construction is the South Florida default where much of the country frames. Cell fill, bond beams, and vertical reinforcement all follow from the wind design.
  • MEP: Equipment elevation in flood zones, condensate and humidity design loads, generator and transfer switch provisions on essential facilities.

What Comes With a Florida Estimate

Every Florida estimate states its compliance basis rather than assuming it:

  • Governing FBC edition and the permit date assumption behind it
  • Wind zone, design wind speed, and Risk Category used
  • HVHZ or wind-borne debris determination for the specific address
  • Product approval path assumed, NOA or Florida Statewide Product Approval, on envelope items
  • Local amendment flag where the jurisdiction is known to add requirements
  • Chapter 713 lien timing note where our scope feeds a Notice to Owner deadline
  • Florida sales tax treatment on materials, including the county discretionary surtax

If an assumption is wrong for your project, you see it on the cover sheet and can correct it before the bid goes out. That is the point of stating it.

Delivered as: Excel with formulas intact, a marked-up PDF plan set, and a CSI-organised summary.

Turnaround: 24 to 48 hours on a standard commercial takeoff.

Every Florida project is quoted individually. Scope, trade count, drawing quality, wind zone, and turnaround all move the price, so we do not publish a flat rate that would be wrong for most jobs. Send the plan set, and you get a fixed quote before any work starts.

Get a Florida Estimate

Send the plan set and the project address. We confirm the wind zone, the governing code edition, and the product approval path before we price anything, then come back with an itemised takeoff.

Get Estimate →

Florida Construction Estimating FAQs

Does a Miami-Dade NOA work anywhere in Florida?+
No. A Miami-Dade Notice of Acceptance is a county approval, valid in Miami-Dade and accepted in Broward. Anywhere else in Florida, the product needs a Florida Statewide Product Approval. A product can hold both.
Which Florida Building Code edition should I bid to right now?+
Use the 8th Edition for permits filed before December 31, 2026. Use the 9th Edition for permits filed on or after that date. Permits filed and issued before that date are generally processed under the 8th Edition. Confirm with the local building department on anything close to the line.
Does Florida have a prevailing wage?+
Not at the state level. The law was repealed in 1979. Federally funded work over $2,000 falls under Davis-Bacon rules. Local wage rules are blocked by HB 433 starting September 30, 2026.
Which Florida counties fall within the High-Velocity Hurricane Zone (HVHZ)?+
Two: Miami-Dade and Broward. Every other coastal county falls under the wind-borne debris region, which has lower design pressures and a different product approval path.
How far inland does the wind-borne debris requirement reach?+
It covers areas at 140 mph design speed and above, plus areas at 130 mph and above within one mile of the coastal mean high-water line. Under the 9th Edition, an expanded impact-resistant envelope requirement near tidal water is expected for new construction.
How fast can you turn around a Florida takeoff?+
24 to 48 hours on a standard commercial scope. Send the plan set and the project address, and we confirm the wind zone and governing code edition before pricing begins.
How much does a Florida construction estimate cost?+
Every project gets its own price. There is no flat rate. The cost depends on the size of the job, how many trades are involved, and how clear the drawings are. Send the plan set, and you receive a fixed quote before any work begins.

Our Recent Projects

Golden Glades Multifamily Apartment Complex

Address: NW 159th St & NW 6th Ave City Of Golden Glades, Miami Dade County FL 33169, USA

Scope of Work: Cost Estimation as a GC which includes Sitework, Interior, Exterior and MEP

CSC Tampa Amenties – Package – 3

Address: 3800 Citibank Center, Tampa FL, 336103800 Citibank Center, Tampa FL, 33610

Scope of Work: Cost Estimation and Material Takeoffs for flooring scope.

1291 South Orange Blossom Trail Office / Warehouse

Address: Apopka, Florida 32703

Scope of Work: Cost Estimation of Sitework including Demolition, Utilities, Grading and Roadway/Signage

Ritz Carliton Residences

Address: Bonita Springs, FL 34134

Scope of Work: Cost Estimation and Material list on Mechanical scope.

Daytona Beach MKDC

Address: Daytona Beach, Florida

Scope of Work: Preliminary Budget Estimate of Senior Living Apartments, Site C Apartments and Restaurant.

Tampa International Airport Renovation

Address: Tampa, Florida

Scope of Work: Cost Estimation as a GC Job.

Deeper Fellowship Church

Address: 4400 South Orange Avenue Orlando, FL 32806

Scope of Work: Cost Estimation of Church Renovation