In Michigan, a $600 job and a state-funded school do not follow the same rules. A state license is required, and every purchase of materials carries a tax decision. An estimate that skips those steps results in overbudgeting and legal issues.

SMA Estimating LLC delivers accurate Michigan construction estimating services for all AEC experts. Send us the plans, and you get back a clean set of numbers.

The $600 Line That Changes Who Can Bid

Michigan sets a low bar for when a license is required. Residential work of $600 or more requires a contractor license from the Department of Licensing and Regulatory Affairs.

Two kinds of home contractors

A Residential Builder license allows contractors to construct an entire building. They can also carry out maintenance activities in that building. This license covers specific trades like:

  • Basement waterproofing
  • Carpentry
  • Concrete
  • Excavation
  • Demolition of a house
  • Insulation
  • Masonry
  • Roofing
  • Gutter
  • Siding
  • Swimming pool
  • Tiles & marble

The $600 figure counts labor and materials together, and splitting one contract into smaller pieces does not get around it. Contractors must display their license at their place of business and carry a pocket card, and an owner can look up a license in LARA’s License Information database. We suggest you ask for the same proof from every sub before their number goes into yours.

Trades with their own licenses

MEP work is licensed separately by the state. A builder license does not cover them.

  • That is why we keep these scopes on separate lines in your takeoff.
  • A licensed sub can price them without re-measuring the job.
  • We ask which license each bidder holds before we group any scopes together.

Commercial work: check the town

Michigan has no statewide general contractor license for commercial buildings. Cities set their own requirements. For this reason, our estimators ask which town will permit the work.

Public Money Brings Posted Wage Rates

When the State of Michigan pays for the work, wages are set for you. The Wage and Hour Division sets wages. It is based on local collective bargaining agreements. The contracting agent must put the rates in the project specifications and on the bid documents.

The timing is also important. If the project is not bid within 90 days of the establishment of the rates, then new rates will have to be established. Our team checks the dates on the rate sheet before we create the labor.

For these jobs, we pull the posted rate for every trade in your scope and build labor from it, fringe included. The same page lists a $500 annual registration fee for contractors and subcontractors, so we flag it as a line to confirm instead of burying it in overhead.

Tax Follows the Materials, Not the Contract

Michigan generally treats a contractor as the final user of the materials built into real property. So the question is not whether to charge the owner. It is how you settle the tax yourself. You either pay sales tax to your supplier, or you report and pay use tax on materials you consumed. 

The Department of Treasury’s contractor manual describes the obligation as generally 6% of the cost of materials used in the job.

Tools, equipment, and supplies that you use up without building them into the structure are generally not exempt. On the other side, materials built into real estate in another state are exempt from Michigan use tax. For a contractor who works across the border, that difference is worth a line of its own.

SMA Estimating LLC shows tax as its own line in the estimate, so you can match it to however your business pays it.

Liens: Why Your Estimate Should Know Who Hires Whom

Michigan’s Construction Lien Act sets short clocks for anyone who is not hired directly by the owner. Under MCL 570.1109, the notice deadlines are:

  • Subcontractors and suppliers: within 20 days after furnishing the first labor or material.
  • Laborers owed unpaid wages: within 30 days after the wages were contractually due.
  • Laborers owed unpaid fringe benefits or withholdings: by the fifth day of the second month after the month they came due.
  • The contractor who will directly deal with the owner will not be required to provide any notice of furnishing for retaining their lien rights.

These are legal deadlines, and a construction lawyer needs to verify them in relation to your project. We mention them because they follow the chain of contracts. When we list scopes by who hires whom, you can see where every sub sits on the job.

The Code Book Behind the Permit

Michigan’s codes do not all move together. The Bureau of Construction Codes lists these as current:

Code Edition Date shown
Building 2021 Michigan Building Code Effective April 9, 2025
Residential 2015 Michigan Residential Code Effective February 8, 2016
Electrical 2023 National Electrical Code Effective March 12, 2024
Plumbing 2021 Michigan Plumbing Code March 12, 2024
Mechanical 2021 Michigan Mechanical Code Effective March 12, 2024
Commercial energy 2021 Michigan Commercial Energy Code Effective April 22, 2025

How We Build a Michigan Number

Every Michigan estimate follows the same short path, so nothing gets missed.

  • We ask who is paying, because state money brings wage rates and private money does not.
  • Team checks the size of the home work against the $600 license line.
  • Cost experts count each trade on its own line, including electrical, plumbing, and mechanical.
  • Our company prices materials with the tax shown separately.
  • We note which code edition applies at the permit office.

Where Michigan Estimates Slip

  1. The first slip is the license line. A small repair job can cross $600 faster than most owners expect, and the contractor who prices it needs the right license to take it.
  2. The second is wage rates on state-funded work. A rate that looked fine on a private job can be too low once the posted rate is applied to the same trade.
  3. The third is the code edition. A remodel priced to the newest book can overshoot when the home is still under the 2015 residential code, and a commercial job priced to an old book can come up short at plan review.
  4. The fourth is the tax line. Treating tax as the owner’s problem leaves your own use tax unplanned, and that shows up after the job is done. A separate tax line gives you something to check against your supplier invoices.