Construction Dumpster rentals are common. It depends on the type of your work, size, and other factors. Every construction project generates debris. So, it is important to manage that waste on time to prevent delays. Renting a dumpster provides a budget-friendly solution for handling construction waste for safety and organizing the worksite.

Busy contractors and building owners must consider the expense of renting a dumpster while evaluating other things. But they neglect it mostly. That is why they should hire a reliable construction estimating company and consider every component to generate accurate estimates. This will help you complete the project under budget. No more delays!

LEARN AND FOLLOW HOW TO RENT A DUMPSTER FOR CONSTRUCTION PROJECTS!

How to Rent a Dumpster for Construction Projects

Step 1: Know about Project Needs

As a contractor, you must know your project requirements. Consider:

  • Project Type 
  • Duration
  • Debris Volume 
  • Debris Type 

Plus, you must also know what type of debris your project will be generating. Common construction waste includes:

  • Heavy Materials 
  • Roofing Waste 
  • General Construction 
  • Landscape Debris 
  • Appliances

Step 2: Choose the proper Size

The next thing is to determine the right size to manage waste.

For 10 Yard Dumpster:

  • The size is measured in cubic yards
  • Dimensions are 14 feet long and 3.5 feet high
  • It can bear 2 to 3 tons of waste
  • 3 pickup truck loads
  • Cost is $220 – $580 per week
  • Used for small renovations, bulky refuse, medium-sized cleanouts, and bathroom remodels

For a 15 Yard Dumpster:

  • It is 16 feet long and 4.5 feet high
  • It holds 2 to 3 tons of debris
  • More than 4 pickup truck loads
  • Cost is $265 – $620 per week
  • Small bathroom, small porch, etc.

Step 3: Pricing

Dumpster rental costs are different based on several factors. It is based on the location. It depends on the location where you are renting. Second, you need to know about the size of the dumpster. If you require large containers, then you will have to pay more. On average, $400 is required for one to two weeks.

If the weight limit is exceeded, then the rental price will also increase. 30-yard dumpsters have a weight limit. It ranges between 4-6 tons. If you exceed this limit, then you will pay $75 – $100.

Step 4: Select the right Company

Choosing the right company is important for achieving the best experience. You must research properly and look for:

  • Check online reviews and ratings
  • Ensure they have the size you need when you need it
  • Clear information about what’s included
  • Confirm they service your location
  • Many companies offer recycling options. It helps to reduce waste.
  • Responsive  
  • Licensing 
  • Insurance

Step 5: Determine Location

Do not get the wrong size of the container. Consider an area that has a solid base. It can handle the weight of dumped materials. 

Do not get worried that the dumpster will ruin your lawn. People use pieces of plywood for smooth walks, etc.

Do not neglect considering the space for the truck. It should be 30 feet minimum in radius. Additionally, the area must be cleared of vehicles or other items. However, countless factors need to be checked. That is why it is better to depend on expert cost estimating services and complete your projects smoothly.

Step 6: Book Your Dumpster Rental

When you are done with the research, it’s time to book your dumpster. Search online and shortlist companies. You need to provide them with the following information:

  • Project address and placement location
  • Desired delivery and pickup dates
  • Dumpster size selection
  • Type of debris/materials
  • Payment information
  • Contact information

Step 7: Schedule Pickup and Manage the Rental

You need to check the dumpster regularly for safety. It must not be overfilled. Some companies have drivers who are available all the time. This way, the construction waste is removed quickly.

Additionally, it is important for contractors to develop a plan for managing waste. It highlights the times of removing the waste. After planning, share it with your team members.

Also, focus on sorting the waste to recycle and reduce its impact. You need to call the rental company when you’re ready to remove the waste.

Conclusion

Dumpster rentals are important to organize your sites. By following this simple guide, you can manage your projects under the right size and volume. Well, this process must not be complicated. So, manage your waste responsibly, and keep your build moving forward, clean, and on budget.

Get in Touch!

Connect with SMA Estimating now by filling out the contact form to receive a quick quotation within the next 5 minutes, including an invoice and a turnaround time. If you have any more questions, a representative will reach out to you ASAP, typically within one business day. Our services deliver tangible benefits to clients throughout the United States. Bid farewell to delays.

Embrace This Opportunity and Join Us Now!