Pool construction is a big and exciting process that depends on your planning and investment. It is better to understand the cost, design options, and construction process. This guide will show you everything that you must know about pool construction in the current industry. However, building a new pool adds a lot of fun to the entire process.

For handling the budget, it is better to get professional Construction Cost Estimating for every step. This will help you choose the right pool type within budget. So, it is better to seek help from professionals rather than just guessing.

DIG IN TO DISCOVER THE COST, DESIGN, AND INSTALLATION STEPS OF POOL CONSTRUCTION TO COMPLETE IT ACCURATELY!

Understanding Pool Construction Costs

The cost to construct a pool is different that varies due to location and size. Let us show you by types:

In-Ground Pool Costs by Type

Fiberglass Pool building typically ranges from $30,000 – $85,000. If we talk about the vinyl pools, then they cost between $35,000 – $80,000. But, if you have more budget, you can build concrete and gunite pools.

Above-Ground Pools

Homeowners who want to build a pool on a low budget can install above-ground pools. They cost between $1000 – $6000.

Pool Design Options and Styles

Rectangular Pools

Rectangular pools are versatile and can work with just about any landscape style, as well as house almost anything you can think of. They are great for lap swimming and take up the most usable real estate.

Kidney-Shaped Pools

You can have fluid style, good looks, and versatility with these kidney-shaped pools that are constructed in a curved shape with a slight indent on one side. Ideal for medium-sized back yards, they create a cozy nook for outdoor furnishings.

Freeform Pools

Freeform shapes are more free-flowing or curvilinear and less influenced by right angles. These designs are a compromise between contemporary construction and natural ponds.

Whatever type you choose, you can get expert help to know about the number of materials required for the job. Their projections are accurate, which helps in completing the job under budget. So, get Material Takeoff Services from a reliable company and unburden yourself.

Pool Construction Process

Stage 1: Design and Planning

The pool construction phases start with the pool designer. This person is responsible for finalizing the layout. This generally takes from one to four weeks, according to the design complexity.

Stage 2: Approvals

Once design finalizations are complete, the appropriate permits from local authorities are obtained. Approvals take a minimum of two weeks in most jurisdictions, though jurisdictions with strict rules, such as some areas in California, can take two months or more to obtain a permit.

Stage 3: Excavation

This is one of the pool building steps that involves digging the pool area to the needed depth. This usually takes a few days to one week. The timing depends on the type of soil.

Stage 4: Steel and Framework Installation

Approximately two days are spent on the steel installation, with workers using different methods to bend and shape the steel to pool shape. Constructing the frame with reinforced steel rebar is spaced so that the structure’s integrity lasts for additional burdens yearly.

Stage 5: Plumbing Installation

Plumbing sustains the circulation system, the complexity of which depends on the features selected. The installer puts in the circulation system, the main drain, the skimmer, and any additional items such as therapy jets, deck jets, or water features. This section takes about a week and includes pulling the required permits for plumbing and electricity.

Stage 6: Electrical Installation

After plumbing, the electrical system is installed. This takes one to two weeks to complete and is done under the supervision of local safety codes. From Concrete Estimation to electrical, everything is covered in the professional assistance.

Stage 7: Shell Construction

Gunite is shot onto the steel frame in a specialized concrete mixture. It takes a week to cure in mild weather, but it can take two or more weeks in cooler, wetter conditions. The walls of the pool will need to be formed as it takes concrete a long time to set, over thirty days in some cases.

Stage  8: Tile, Coping, and Finishing

After the shell has covered and the concrete has been set for a while, which should take about a week to complete. The waterline tile is placed, and the interior finish is secured to the pool. It’s a plaster finish for one of the more popular options, like pebble.

Stage 9: Final Inspection

Pool water filling takes 2 days. Plus, the installation of the pump and heater requires two more work days.

Final Words

The key to successful pool construction depends on careful planning and budgeting. Your finances should be enough to construct the desired pool. The design selection also depends on your budget. So, it is better to understand all the stages. This will help you construct the pool properly without facing over-budgeting.

Get in Touch!

Connect with SMA Estimating now by filling out the contact form to receive a quick quotation within the next 5 minutes, including an invoice and a turnaround time. If you have any more questions, a representative will reach out to you ASAP, typically within one business day. Our services deliver tangible benefits to clients throughout the United States. Bid farewell to delays.